IEC 61914:2021 explicitly brings liners, optional parts, mounting surfaces, cable voltage classes, plated-product corrosion classes and multi-cable axial testing into the test context. A change is not automatically harmless or automatically disqualifying; its effect on the tested load path and acceptance claim must be documented.
Do not approve report reuse from the model name alone. Compare the tested and supplied configuration: body, size, liner and optional parts, fasteners and torque, cable or mandrel, formation, mounting surface, load direction, temperature and declared duty. Classify the result as documented equivalent, engineering review with supplementary evidence, or repeat test.
- Best for
- Electrical, QA and procurement teams reviewing substitutions, supplier changes, cost-down proposals or revised cleat assemblies after an IEC 61914 report was issued.
- Not suitable for
- A laboratory extension statement, engineering approval or evidence that every product sharing a family name has the same tested rating.
- Decision checks
- report revision, exact model and size, body material, liner, optional parts, fasteners, torque, cable formation, mounting, load direction, temperature and rating
- RFQ inputs
- tested BOM, supplied BOM, drawings, change notice, test setup, cable data, mounting detail, installation torque, report and laboratory scope
§ 01 Build a tested-configuration fingerprint
Record the report number and revision together with cleat model, size, body material, liner and optional parts, fastener set and tightening instruction, cable or mandrel diameter, formation, mounting surface, fixing pattern, load direction, temperature and declared performance.
§ 02 Liner and optional-part changes need review
IEC 61914:2021 added the liner definition and test requirements where liners or optional parts are used. A change in thickness, hardness, material, profile or retention can alter fit, cable protection, movement and the force path; a shared body does not prove equivalent performance.
§ 03 Fasteners and torque belong to the assembly
Changing bolt diameter, grade, washer, nut, coating, quantity or tightening instruction can alter closure and fixture capacity. Confirm whether the tested assembly used the same hardware and whether the report or manufacturer controls installation torque.
§ 04 The mounting surface is part of the declared context
IEC states that cable cleats can rely on a manufacturer-specified mounting surface for axial or lateral retention. Tray, ladder, strut, rail, beam and plate are not automatically interchangeable when thickness, hole pattern, edge distance or fixing access changes.
§ 05 Cable size and formation must remain inside evidence
Compare cable OD, number of cables, trefoil or flat formation, voltage class where relevant, axial or lateral load direction and any short-circuit test arrangement. A report for one size or formation is not automatically evidence for another.
§ 06 Use three disposition outcomes
Documented equivalent requires traceable evidence that the changed item is identical in function and controlled configuration. Supplementary evidence can include drawing review, material comparison or a limited test when engineering accepts the boundary. Repeat testing is appropriate when the changed configuration affects the tested load path and equivalence cannot be demonstrated.
§ 07 Control the approved configuration after release
The released BOM, drawings, report revision and installation instruction should be linked. Later substitutions need a change record that identifies affected claims, reviewer, supporting evidence and whether project or laboratory approval is required.
§ 08 Evidence levels
| Evidence level | Use | Boundary |
|---|---|---|
| TESTED | Result matches the tested configuration. | Does not cover changed components or installation. |
| BATCH-TRACEABLE | Record links to the delivered lot. | Does not prove unrecorded system performance. |
| STANDARD-BASED | Official scope defines a method or decision system. | Does not select project criteria or prove this product passed. |
| PROJECT-SPECIFIC | Customer risk and drawings close the decision. | Cannot be generalized to another project. |
| INDICATIVE | Example or early screening logic. | Not an acceptance plan or guaranteed value. |
§ 09 Decision matrix
| Change | Initial disposition | Evidence needed |
|---|---|---|
| Packaging only | Usually outside mechanical test configuration. | Part identity and no product change. |
| Traceable identical part | Potential documented equivalent. | Same specification, drawing, supplier control and revision. |
| Liner material or profile | Engineering review; repeat test may be needed. | Fit, cable protection, movement and test-claim impact. |
| Fastener, torque or fixing count | Engineering review or repeat test. | Assembly drawing and load-path equivalence. |
| Mounting surface or hole pattern | Project-specific review; often supplementary test. | Fixture stiffness, fixing capacity and tested orientation. |
| Cable OD or formation | Do not transfer automatically. | Report range or matching configuration test. |
§ 10 Official sources and evidence boundary
These official sources define sampling, measurement or cable-cleat test scope. They do not select project acceptance criteria or certify a Weique product by themselves.
- IEC 61914:2021 — Cable cleats for electrical installations
- NREL — Offshore Wind Electrical Safety Standards
- ISO/IEC 17025:2017 — Competence of testing and calibration laboratories
- ISO 9001:2015 — Quality management systems — Requirements